Since the rating system can be used as an assessing tool for a single website as well as a tool to compare the performance of more than one website under the same category, the option of storing the information from a single website is dealt with in this project.
The database server is created using SQL Server where the data is stored in a central table which can be accessed by other analytical applications as server-side implementation. The technical details of the database as well as the .Net method used for the development of the system are discussed in the project report.
5: Requirements to meet project Aim
The technical requirements to meet the project aim of implementing a website rating system to capture information from a web form in a HTML web page, transfer it to a database server for analysis is listed below
Microsoft .Net Framework for the deployment of the web projects in an integrated manner.
HTML and XML 1.0 for the development of the web page content for capturing the information from the visitors to the website.
Microsoft SQL Server to design and deploy the database for storing the information in the table for further analysis using server-side implementations.

Apart from the aforementioned technical elements, a specific requirement is to capture the nature of the information that should be requested as feedback from the visitors to a website and the appropriate method of standardising the information. This is because of the fact that only by using a dataset that can be checked against a specific method of arrangement, effective analysis can be performed to derive near accurate results on the quality of information presented by the website as argued by Efrium Turban et al (2004). In order accomplish the abovementioned, a critical analysis on the nature of information that would attribute to the quality of information and the website as a whole is essential as part of the project design itself.

6: Schedule for the Project
The overall time scale for the completion of the project is estimated to be 20 days. The project is completed in three stages as presented below
Stage 1: Design
This is the stage where the overall project designs both at a high level and at the operational level is drafted. The analysis of the information that should be captured in for web page rating is also conducted at this stage, which will reflect in the design drafted for development. It is estimated that the duration to complete this phase will be 10 days. The allocation of 50% of the overall time for the design itself signifies the emphasis on the need for an effective design to ensure efficient data manipulation and transfer of information to the server.


Thanks